It only takes an hour or two to get this all set up. After that, you
can do two yards
in a fairly long day. The heaviest work is the finish work with this
set-up. The mixer
bucket tilts back to accept the gravel. The tractor picks up a load
and you dump in
about half. After mixing the cement in and adding water, you tilt the
mixer back to the
chute and dump the rest of the aggregate.